Organisation Gas Thermal Plant
Alternate Name  
Abbreviation  
Parent Kipevu Thermal Power Station
u.r.l.  
email  
Country Kenya
Location Kipevu
Address  
Postal Address  
Telephone  
Management u.r.l.  
Fax  
Sector Thermal Plants
Organisation Type African Private Sector
Status  
Stated Role To generate 63 MW of power from two gas-fired plants
Activities  
Geographical Focus  
Notes GAS TURBINES
Two gas turbines have been installed at Kipevu with a total installed capacity of 63 MW.
Gas turbine 1
Commissioned in 1987
Installed capacity is 31MW.
The generator has a capacity of 39200 KVA at 11000 volts and 2058 amps. 3 phase 50Hz rotating at 3000 rpm.
Gas Turbine 2
Commissioned in 1999.
Installed capacity is 32 MW.
The generator has a capacity of 40662 KVA at 11000 Volts and 2129 amps. 3 phase 50Hz rotating at 3000 rpm.

[ Retrieved on 05 MAR 2008 - http://www.kengen.co.ke/content.asp?id=8&;catid=13 ]
Current Positions
Position Name From To
Budgets
Donor From To Budget ($) Note
Links to Related Organisations
Parent Tree Kipevu Thermal Power Station
KenGen Thermal Power Plants
KenGen Power Plants
Kenya Electricity Generating Company
Subsidiary Organisations  
Sibling Organisations Kipevu I Diesel Plant
Associated Organisations  
Donor Recipients  
Past Positions
Position Name From To
Record last updated on 05 MAR 2008